Castle Roofing Margate Call 01843 305243 Get a quote

Consumer rights

Can I cancel a roofing contract after signing it?

Work agreed in your own house usually carries a cooling-off period. Here is how long it runs, when it stretches and when it does not apply.

The short answer

Yes, you can usually cancel a roofing contract after signing it. If you signed in your own house, even once the roofer had finished surveying, the Consumer Contracts Regulations give you 14 days to cancel, and you need give no reason. The big exception is a callout you asked for because a repair could not wait, where no right to cancel exists.

Why a contract signed at home counts

Where you sign is what counts. Under regulation 5 of the Consumer Contracts Regulations 2013, a deal struck anywhere except the "business premises of the trader" is off-premises. Your living room, your front step and your driveway all qualify. A roofer who climbs up, comes down, and has you sign in your hallway has made exactly that kind of contract.

Regulation 29 then lets you cancel at any point in the cancellation period, with no reason given. You need not show that the work was poor or the price wrong; a change of mind is enough.

For a service such as a re-roof, regulation 30 sets the period at 14 days, running out 14 days after the day you made the contract. Citizens Advice calls 14 days the minimum cooling-off period a seller must give, and it counts day one as the day after you sign.

A signature given at the roofer's own office or at a trade counter is a different case, so check where yours was made before you rely on the 14 days.

Longer than 14 days, and shorter

Two situations change how long the period lasts. Regulation 31 lengthens it when the trader did not make you aware that the right existed. The period then runs on for 12 months after the day on which it would otherwise have ended, so a contract with no cancellation notice in it can be cancelled long after signing.

The pressure the other way comes from work that starts early. Under regulation 36, a trader may begin the work inside the 14 days only if you expressly ask for that, and for an off-premises contract the request has to be made on a durable medium, such as a signed form or an email. A roofer who turns up on day two without anything of the kind in writing has not met that rule.

Cancellation periods at a glance
SituationPosition
Signed at home, notice given14 days from the day after signing
Signed at home, no notice givenUp to 12 months more
Work started in the periodOnly on your written request
Urgent repair visit you asked forNo right to cancel

The urgent repair exception

Regulation 28(1)(e) removes the right to cancel where you made a point of asking the trader round to carry out "urgent repairs or maintenance". Citizens Advice frames it as your own invitation: you asked the firm in because something needed mending quickly, and that invitation is what takes the cooling-off period away.

A ceiling dripping at midnight and a roofer called to stop it is the clear case. You asked for the visit, the repair was urgent, and the 14 days do not apply.

The wording follows the visit you requested. A survey booked weeks ahead for a whole re-roof is not the same as a leak you rang about that day. If a trader calls the work urgent only after you have signed, ask what made it so before you accept that the right has gone, and ring the helpline given below.

Nothing here stops an emergency repair being challenged afterwards. Your right to work done with reasonable care and skill stays in place, and our answer on what to do if a roofer's work is poor covers how to use it.

How to cancel, and who to ring

If you want to cancel and you are still inside the period, put it in writing and keep a copy. A dated email or letter is easier to point to later than a phone call, and it fixes the day you gave notice.

  1. Find the contract and the date it was signed.
  2. Count the days from the day after, and send your notice well inside them.
  3. Say clearly that you are cancelling, and name the job and the address.
  4. Keep proof that you sent it, such as a sent-mail record or a postal receipt.

If the roofer disputes your right, or you are unsure which period applies, the Citizens Advice consumer helpline is on 0808 223 1133.

Before you sign anything, it helps to know what a written roofing quote should include and whether a request for money up front is fair, which our answer on roofer deposits sets out.

For roofing in Margate and the rest of Thanet, the price is put in writing after the survey, so you have it in front of you and can read every word before you decide.

Cancelling and cooling-off

When do the 14 days start for a roofing contract?

Citizens Advice counts day one as the day after you sign, and regulation 30 ends the 14 days after the day you made the contract. Sign on a Monday and your first day is the Tuesday, so count carefully and send your notice early rather than on the last day.

What if the roofer starts work inside the 14 days?

Under regulation 36, work can begin inside the period only on your express request, and for a contract signed at home that request must be on a durable medium. Check what you signed, and ring Citizens Advice on 0808 223 1133 if you are unsure where you stand.

Your next step

Read any contract in full before you sign it. We send one written price after the survey so you have time to read it.

Get a written quoteCall 01843 305243WhatsApp us

More on this: Roofers in Margate

Tell us what's wrong

Call 01843 305243WhatsApp us

10-year workmanship guarantee, in writing.

Call Get a quote WhatsApp
WhatsApp us