You get the rule that governs work at height, the main kinds of equipment and where each suits, the Kent licence for scaffold on the highway, the special case of fragile roofs and the questions worth asking a roofer.
Roofing is work at height, and the first decision on any job is not the tile or the slate. It is the way people will reach the roof and stay on it. Whether the job is clearing a gutter, replacing a few tiles or stripping a whole slope, the equipment chosen decides how safe the work is, how long it takes and, often, how much it costs.
This guide describes the equipment you are likely to see outside your home: scaffolds, mobile towers, ladders, roof ladders, harnesses and edge protection. It also covers the legal rule behind them, the licence needed when scaffold sits on the public highway in Kent, and the special danger of fragile roofs such as asbestos cement sheeting.
You do not need to buy or use any of it yourself. The point is to know what good practice looks like on your property. Roof cleaning needs access as much as repairs do, and the roof cleaning and moss removal page says how access is planned before a clean is priced.
The rule behind every piece of equipment
The Work at Height Regulations 2005 set the standard for anyone working above ground. Regulation 6(3) puts the duty on "every employer", who is bound to provide "suitable and sufficient measures" to guard against a fall. The test is "so far as is reasonably practicable", and the harm to guard against is a fall "liable to cause personal injury". You can read regulation 6 on legislation.gov.uk.
Two phrases in that sentence do the work. Suitable and sufficient means the measure has to fit the job: a ladder that suits a gutter does not suit a ridge. So far as is reasonably practicable means the measure is weighed against the risk, not applied blindly. In practice a roofer chooses the equipment that stops a fall, and falls back on equipment that only catches one when stopping it is not possible.
For a homeowner, the duty falls on the roofer. Under CDM 2015, regulation 7(1), a homeowner's client duties transfer to the contractor on a single-contractor job, and to the principal contractor where several firms work. HSE defines a domestic client as a person whose own home is the site of the building work.
- You are not expected to plan the access yourself.
- You are entitled to ask how the roof will be reached.
- You should expect a plain answer, not a shrug.
Our answer on roof cleaning access shows how that works in a real job, from the ladder at the eaves to the platform at the ridge.
Scaffolds: platform, edge and licence
A scaffold is a temporary frame around part or all of a house. It gives the roofer a level platform, guard rails at the edge and a way up that is not a ladder. For work on the roof edge, the eaves, the fascia or the whole slope, it is the standard answer, because it stops a fall instead of catching one.
A sound scaffold has these parts:
- Standards, the upright tubes, standing on firm, even ground.
- Ledgers and transoms, the horizontal tubes that carry the platform boards.
- Guard rails and toe boards on every open edge of the platform.
- Ties to the building, which stop the frame leaning away from the wall.
- A ladder or stair access that is itself secured.
If the scaffold stands on the public highway, which includes the pavement in front of many Thanet terraces, you need a licence from Kent County Council under section 169 of the Highways Act 1980. On its licence page Kent County Council says the scaffolding company, not you, lodges the application. The 2026 to 2027 fee is £52 per week, the application goes in at least 5 working days beforehand, and Kent adds £78 for a site inspection if it deems one necessary.
Kent's conditions also ask for the upright standards to be white-painted over the bottom 2.5 metres, and the licence holder must carry public liability cover. For questions about a licence, Kent County Council highways is on 03000 41 81 81.
Our answer on roof cleaning access says when a cleaning job needs a scaffold and when a tower will do.
Towers, ladders and what each suits
Not every job needs a full scaffold. A mobile access tower is a lighter frame on wheels, with a platform at a set height, and a ladder is the simplest of all. Each is right for some tasks and wrong for others, and the choice depends on how high the work is, how long it lasts and whether the roof itself must be walked.
| Equipment | Suits | Limits |
|---|---|---|
| Scaffold | Long jobs, whole slopes | Takes time to build |
| Mobile tower | Short jobs at one place | Needs firm, level ground |
| Ladder | Brief, light access | No platform, one-hand work |
| Roof ladder | Reaching a ridge on a pitch | Needs a sound ridge to hook |
A ladder is for access, and it is a poor place to work from for long. A roofer who spends an hour on a ladder doing a two-handed job has chosen the wrong equipment. A mobile tower is steadier, since it gives a platform with rails, but it must stand on ground that is firm and level and be used at the height the maker allows.
The pavement matters too. A tower that stands on the footway is worth raising with Kent County Council highways first, since section 169 reaches beyond scaffolding to other structures obstructing the highway. Where a skip is also needed on the highway, Kent County Council issues a skip permit at £45 per week for 2026 to 2027, with notice of 5 working days; the skip itself can be no longer than 5 metres or wider than 2. Ask who is applying and when, before the start date is set.
Harnesses and roof ladders
A harness is a body belt with leg loops, connected by a lanyard to an anchor point. It is personal protection, which means it does not stop a fall. It limits the distance and the force once a fall has begun. Under the thinking in regulation 6(3), equipment that prevents a fall comes first, and a harness is what remains when prevention is not practicable.
Its value depends entirely on the anchor. A harness clipped to a loose ridge tile, a chimney pot or a rotten rafter protects nobody. The anchor needs to be rated, fixed to something sound and placed so that a fall is short. That is why a harness is seldom a stand-alone answer on a house roof, and why a roofer who relies on one should be able to say where the anchor is and what it is fixed to.
A roof ladder is a different tool. It is a ladder fitted with a hook at the top and wheels or runners, laid flat on the roof slope with the hook over the ridge. It spreads the roofer's weight across several rows of tiles and gives a firm foothold on a pitch. It is not a substitute for edge protection. It is a way to work on the slope itself.
- Roof ladders need a ridge that is sound and a surface that is dry.
- Harness anchors need to be fixed to the structure, not to the covering.
- Both are used with a ladder or tower to get up in the first place.
We do not recommend anyone use a harness or roof ladder without training. The equipment is only as good as the person who sets it up.
Fragile roofs and asbestos cement
Some roofs cannot take a person's weight at all. Roofs made of asbestos cement sheets, old roof lights and some thin profiled sheets are fragile: a step in the wrong place and the sheet gives way. The HSE guidance in A14 calls asbestos cement roofs fragile every time, however sound they look.
These roofs turn up on garages, outbuildings, sheds and farm buildings, and sometimes on the covered link between a house and a garage. HSE's advice is to treat any building constructed or refurbished before 2000 as containing asbestos, and external soffits can contain asbestos insulating board.
What this means for access:
- Never walk on a roof you cannot identify, and never walk on a roof you suspect is asbestos cement.
- Work on a fragile roof needs crawl boards or a platform that spreads the load, with edge protection, and often a net or a mobile platform beneath.
- Careful removal of asbestos cement is non-licensed work, but it must be done without breaking the sheets, and the waste must be wrapped twice and stored in a locked or sealed container, and an open skip is not acceptable.
- Asbestos insulating board is a different matter: it can be licensable work, which goes to a specialist firm holding the right authorisation from HSE.
Our answer on cleaning an asbestos cement roof explains why scraping and brushing are not simply done on such a surface.
If you think a roof may be asbestos cement, do not climb on it. Send photos and let it be assessed from the ground.
Questions to ask before anyone goes up
You do not need to supervise a roofer, but a few direct questions at the quote stage tell you a good deal about how the job will run. A roofer who has thought about access answers them without fuss.
- How will you reach the roof, and what will you stand on while you work?
- Is the equipment going on my land or on the pavement, and who applies for any Kent County Council licence?
- What protects the open edge, and what is the plan if a tile or board comes loose?
- Is any part of the roof fragile, and how will you tell before anyone steps on it?
- What happens to the waste, and is any of it likely to be asbestos?
You may also want to know how long the equipment stays. A scaffold licence is charged per week, so a job that overruns costs more, and a roofer should say when it comes down. The cost of access sits inside the price, which should state whether scaffold is included.
Equally useful is what you do yourself. Keep children and pets clear of the work area. Move cars from beneath the roof edge. Tell neighbours when a scaffold is going up. Never go onto the roof or the scaffold to look at progress; take photos from the ground.
If you are tempted to do the work yourself, our answer on cleaning your own roof is a sober place to start. Safe working at height is a skilled job, and the right equipment is part of the skill.



